Globaluf’s engineering team recently completed the live commissioning and formal handover of a custom industrial groundwater purification plant in Johor, Malaysia. Extracted from a 270m deep borehole, the raw water carries heavy concentrations of mud, silt, and sand, resulting in persistent turbidity levels consistently exceeding 50NTU.
Live sampling comparison showing Raw Well Water (far left, Clarified Water, UF Permeate, and Final RO Drinking Water far right).
Step-by-Step Chemical Dosing & Process Logic
To prevent rapid membrane fouling and ensure continuous operation, Globaluf implemented a 3-stage pre-treatment and filtration chain:
Stage 1: Chemical Coagulation & Lamella Clarification
Primary Dosing Tank (Coagulation): A fast mixer at 64 rpm blends Polyaluminum Chloride (PAC, 30–50 mg/L) to bind colloidal particles. Sodium Hydroxide (NaOH) is added to optimize pH for maximum flocculation efficiency, alongside Sodium Hypochlorite (NaClO) for microbial disinfection.
Secondary Dosing Tank (Flocculation): A slow mixer at 32 rpm blends Polyacrylamide (PAM, 1–2 mg/L) to expand floc size.
Inclined Plate Settler (Lamella Clarifier): Water flows through a honeycomb lamella media basin where heavy flocs settle out rapidly (sludge is discharged every 8–12 hours), dropping raw turbidity from > 50NTU to under 1.0NTU.
Top-down view of the concrete lamella clarifier basin with mechanical agitators.
Automated chemical dosing station with PE tanks and metering pumps.
Stage 2: Ultrafiltration (UF) Membrane Barrier
Clarified water is stored in a 6m3 buffer tank, then passes through a sand filter, an activated carbon filter and a cartridge filter on the UF skid before entering the hollow-fiber UF modules. The 0.01um pore size blocks residual suspended solids, colloidal silica, and bacteria, maintaining a Silt Density Index (SDI below 3.0).
The UF permeate feeds into the RO skid where high-pressure pumps force water through semi-permeable membranes. Operating live at an inlet conductivity of 652uS/cm (pH =8.0), the system achieved a 7.29uS/cm permeate conductivity (98.9% desalination rate) with a neutral pH of 7.0.
Real-time RO control panel showing feed conductivity and pure water output.
Complete walkway view showing parallel alignment of UF and RO skids.
Handover & Client Video Walkthrough
Following performance optimization and backwash cycle verification, Sales Manager Victor and Globaluf field engineers completed formal client training. The client’s management team expressed complete satisfaction with the system’s ease of operation and water purity.
Complete Groundwater RO System Handover & Client Testimonial in Malaysia
Take the Next Step Toward Reliable Water Treatment
Are you facing high-turbidity groundwater, rapid membrane fouling, or strict water purity requirements for your industrial facility or upcoming EPC project?
Globaluf provides membrane water treatment equipment and engineering support engineered specifically for your raw water chemistry.
Free Technical Consultation & Raw Water Analysis Evaluation
Customized System Design, P&ID and CAD Drawings
Factory-Direct Supply
Complete On-Site Global Installation & Commissioning Support
Contact Us Today for a Free Project Proposal:
Company: Guangzhou Globaluf Water Treatment Co., Ltd., China
A 5 m³/h reverse osmosis plant designed, factory-tested and shipped for high-fluoride, iron-rich borehole water in Tanzania’s Kilimanjaro border region.